Fictional concept website by FAFO Marketing — not a real business

Back to FAFO portfolio
A-10Services06 systems

What we build,
and how.

Each service below lists what’s included, how long it usually takes, the materials we use, and the questions people ask most. Nothing here replaces seeing your roof — that part is free.

Request a free inspection
Roofer prying up worn shingles during a tear-off

Architectural shingle replacement

A complete reroof: everything comes off down to the deck so we can see the wood, fix what’s soft, and build the new roof up in the right order.

Neighboring two-story homes with brown architectural shingle roofs

What’s included

  • Tear-off to the deck and magnetic nail sweep
  • Replace damaged decking (priced per sheet, shown on your estimate)
  • Synthetic underlayment; self-adhered membrane at valleys and eaves
  • New drip edge, pipe boots and step flashing
  • Laminated shingles + hip and ridge cap
  • Ridge vent, balanced with soffit intake
  • Final walkthrough with a photo record

Typical timeline

  1. Day 0Materials dropped, driveway protected
  2. Day 1Tear-off, deck repairs, dry-in
  3. Day 2Shingles, flashing, ridge
  4. FinalCleanup, magnet sweep, walkthrough

Materials

Shingle
Laminated asphalt, color chosen from samples
Underlayment
Synthetic + self-adhered membrane
Flashing
Pre-finished steel; new pipe boots
Vent
Shingle-over ridge vent

Questions about architectural shingle replacement

Standing-seam metal roofing

Concealed-fastener panels with raised seams, formed to length and fastened with clips that let the metal move with the heat.

Green standing-seam metal roof on a white house with a chimney

What’s included

  • Tear-off of the existing roof (no metal over shingles)
  • Deck inspection and re-nailing
  • High-temperature synthetic underlayment
  • Panels formed to length for each roof plane
  • Clips, closures and custom trim at eaves, rakes and walls
  • Ridge closure and vented ridge where the design allows
  • Final walkthrough with a photo record

Typical timeline

  1. Week 0Measure, color selection, panel order
  2. Day 1Tear-off, deck repairs, dry-in
  3. Days 2–5Panels, trim, flashing
  4. FinalCleanup, magnet sweep, walkthrough

Materials

Panel
24 or 26 ga steel, 1"–1.5" seam
Finish
Galvalume or painted, from color chart
Underlayment
High-temperature synthetic
Fastening
Concealed clips

Questions about standing-seam metal roofing

Storm + leak repair

We trace where water is actually getting in, repair it in layers, and give you dated photos of what we found and what we did.

Gabled buildings under heavy storm clouds across an open field

What’s included

  • Temporary protection (tarp) when it is safe to go up
  • Leak trace from the attic and the roof surface
  • Remove damaged shingles or panels past the damage line
  • Underlayment and flashing repair under the damaged area
  • Matched materials where still manufactured
  • Before / during / after photos, labeled by roof plane

Typical timeline

  1. CallLogged, scheduled in the order received
  2. VisitInspect, tarp if needed, photos
  3. RepairUsually half a day to one day
  4. AfterPhoto record emailed to you

Materials

Shingle
Closest available match to existing
Underlayment
Synthetic + self-adhered membrane
Flashing
Step, counter and pipe flashing as needed
Temporary
Reinforced tarp, battened, not nailed through the field

Questions about storm + leak repair

Inspections + written estimates

Free, on site, no pressure. We walk every roof plane we safely can, check the attic, and send you a written estimate with a labeled photo report.

Roof planes with weathered dark shingles under hazy light

What’s included

  • Every accessible roof plane, photographed and labeled
  • Flashing, penetrations, valleys and edges
  • Attic check for daylight, stains and ventilation
  • Gutters and where the water goes
  • Measurements for an accurate estimate
  • Written estimate with line items you can compare

Typical timeline

  1. BookChoose a weekday or Saturday window
  2. On siteAbout 45–90 minutes, typical
  3. ReportPhotos + notes, usually within 2 business days
  4. EstimateWritten, itemized, yours to keep

Materials

Report
PDF: labeled photos by roof plane
Estimate
Itemized; options side by side
Notes
Damage vs. normal wear, called out separately
Cost
Free

Questions about inspections + written estimates

Seamless gutters

Seamless aluminum formed on site in one piece per run, hung on hidden hangers, and pitched so water leaves the house where you want it to.

House with garages, white trim and gutter runs along each roof edge

What’s included

  • Remove and haul off old gutters
  • Fascia check; rotten boards replaced at the listed price
  • Seamless 6" K-style runs, formed on site
  • Hidden hangers about every 24"
  • 3" × 4" downspouts with extensions or splash blocks
  • Optional guards for heavy pine-needle lots

Typical timeline

  1. VisitMeasure runs and discharge points
  2. Install1 day for most homes
  3. CheckWater test with a hose before we leave
  4. FinalCleanup + walkthrough

Materials

Gutter
6" K-style seamless aluminum
Downspout
3" × 4" aluminum
Hangers
Hidden, screw-fastened
Colors
From the manufacturer chart

Questions about seamless gutters

Attic ventilation

A roof lasts longer when the attic can breathe. We balance intake at the eaves with exhaust at the top so hot, damp air has a way out.

Metal roof with a white cupola vent at the ridge

What’s included

  • Attic check: intake, exhaust and blocked soffits
  • Soffit or edge intake vents
  • Baffles to keep insulation off the intake
  • Ridge vent, or box vents / cupola where ridge length is short
  • Bath and kitchen fans checked for venting into the attic

Typical timeline

  1. InspectAttic + roof, measured airflow balance
  2. PlanShown on your estimate
  3. InstallUsually with a reroof; standalone in a day
  4. FinalWalkthrough with photos

Materials

Intake
Continuous soffit or edge vent
Exhaust
Shingle-over ridge vent or box vents
Baffles
Rigid rafter baffles
Ducting
Insulated duct for fans to exterior

Questions about attic ventilation

Next step

Get someone on the roof before you get a price.