Every roofstarts ona ladder.
Shingle, standing-seam metal and storm repair across St. Tammany and nearby. We climb up, measure and photograph — then hand you a written estimate and a photo report before anyone talks contract.

Tear-off to the deck. Every replacement.
The free inspectionSpec
On every replacement
- 01Tear-off to deck
- 02Soft decking replaced
- 03Membrane at valleys
- 04New flashing + boots
- 05Magnet sweep
Six systems.
One way of building them.
Pick a system to see what goes into it, layer by layer — the same spec you’d see on our written estimate.

System 01 of 06
Architectural shingle
Full tear-off to the deck, new underlayment and laminated shingles — the system on most Northshore homes.
- Profile
- Laminated (dimensional) asphalt shingle
- Best for
- Pitched roofs, roughly 4/12 and steeper
- Underlayment
- Synthetic field; self-adhered membrane at valleys, eaves and penetrations
- Ventilation
- Balanced soffit intake + ridge exhaust
- Typical time on site
- 1–3 days for most homes
Build-up, deck to topSection · n.t.s.
- Deck — plywood/OSB, bad sheets replaced
- Synthetic underlayment
- Drip edge + starter course
- Laminated shingles
- Ridge vent + cap

System 02 of 06
Standing-seam metal
Concealed-fastener panels with raised seams. Long runs, clean lines, and nothing exposed to back out in the heat.
- Profile
- Concealed-fastener panels, 1"–1.5" seams
- Metal
- 24 or 26 ga steel, Galvalume or painted finish
- Best for
- Roughly 3/12 and steeper; long, simple roof planes
- Underlayment
- High-temperature synthetic
- Typical time on site
- 3–6 days
Build-up, deck to topSection · n.t.s.
- Deck — inspected and re-nailed
- High-temp underlayment
- Panel clips / fasteners
- Standing-seam panels
- Ridge closure + cap

System 03 of 06
Storm + leak repair
Find the actual entry point, open up only what has to come off, rebuild it in layers and photograph each one.
- Scope
- Temporary protection, leak trace, sectional repair
- Materials
- Matched to existing where the product is still available
- Documentation
- Before / during / after photos for your records
- Insurance
- We document damage; your insurer decides the claim
- Typical time on site
- Half day to 1 day
Build-up, deck to topSection · n.t.s.
- Deck checked for soft spots
- Underlayment patched past the damage
- Flashing reset or replaced
- Matched shingles / panels
- Sealed, photographed, logged

System 04 of 06
Inspections
A walk of every roof plane and the attic, then a written estimate and a labeled photo report you keep.
- Cost
- Free — no obligation
- Time on site
- About 45–90 minutes, typical
- Checks
- Every roof plane, flashing, penetrations, attic, gutters
- You get
- Written estimate + labeled photo report
- Good for
- Leaks, storm checks, pre-sale, end of a roof’s life
Build-up, deck to topSection · n.t.s.
- Attic + decking from below
- Ventilation, intake to exhaust
- Flashing + penetrations
- Field shingles / panels
- Gutters + drainage path

System 05 of 06
Gutters
Seamless runs formed on site, hung on hidden hangers and pitched to move water off the slab, not toward it.
- Profile
- 6" K-style seamless aluminum
- Downspouts
- 3" × 4", with extensions or splash blocks
- Hangers
- Hidden hangers, about 24" on center
- Options
- Guards for pine-needle lots
- Typical time on site
- 1 day for most homes
Build-up, deck to topSection · n.t.s.
- Fascia board checked / replaced
- Drip edge over the gutter
- Hidden hangers
- Seamless gutter run
- Downspouts + discharge

System 06 of 06
Ventilation
Balanced intake and exhaust so the attic isn’t baking the roof from underneath all summer.
- Intake
- Continuous soffit or edge vents
- Exhaust
- Ridge vent, or cupola / box vents where ridge is short
- Also
- Baffles so insulation doesn’t block intake
- Signs
- Hot upstairs rooms, damp decking, curled shingles
- Typical time on site
- Usually done with a reroof; standalone in a day
Build-up, deck to topSection · n.t.s.
- Soffit intake
- Baffles at the eaves
- Air path under the deck
- Roof covering
- Ridge exhaust
How a job runs.
Four stages, the same on every roof. You always know which one you’re in and what you get at the end of it.
Inspection
We walk every roof plane we safely can, check the attic, measure, and photograph what we find.
- Time
- 45–90 min, typical
- You get
- Photo report
- Cost
- Free
Written estimate
Line items, materials and options side by side — decking priced per sheet before work starts.
- Format
- Itemized PDF
- You get
- Options to compare
- Pressure
- None
Install day
Driveway protected, tear-off to the deck, bad sheets shown to you before they’re replaced, roof dried in the same day.
- Crew
- On site from 7 AM
- You get
- Daily photo update
- Shingles
- 1–3 days
Cleanup + walkthrough
Magnet sweep of the yard and drive, debris hauled off, then we walk the finished roof with you, photos in hand.
- Sweep
- Magnetic, full lot
- You get
- Final photo record
- Sign-off
- With you

On the board.
All projects + specs
Atlantic hurricane season · June 1 – November 30
Storm rolled
through?
Start with safety and photos, not a ladder. We help you document roof damage for your insurer — we don’t promise how a claim turns out.
- 1Stay off the roof.Wet shingles and hidden damage don’t mix. Watch for downed lines.
- 2Photograph from the ground.Every side of the house, debris, and any stains inside.
- 3Stop water inside.Buckets, towels, move belongings. Call us for a tarp.
- 4Call your insurer.Get a claim number before anything beyond temporary repairs.
Towns we serve
North of the lake from Slidell to Folsom, and west into Hammond and Ponchatoula. Check your zip code.

