Fictional concept website by FAFO Marketing — not a real business

Back to FAFO portfolio
Residential + light commercial roofingNorthshore, LA

Every roofstarts ona ladder.

Shingle, standing-seam metal and storm repair across St. Tammany and nearby. We climb up, measure and photograph — then hand you a written estimate and a photo report before anyone talks contract.

Roofer bent over a pry bar, tearing worn asphalt shingles off a roof beside a two-story house

Tear-off to the deck. Every replacement.

The free inspectionSpec

01InspectionFree, on site
02EstimateWritten + itemized
03Photo reportLabeled by roof plane
04ObligationNone

On every replacement

  • 01Tear-off to deck
  • 02Soft decking replaced
  • 03Membrane at valleys
  • 04New flashing + boots
  • 05Magnet sweep
A-01SystemsSelect a system

Six systems.
One way of building them.

Pick a system to see what goes into it, layer by layer — the same spec you’d see on our written estimate.

Two-story homes with layered brown architectural shingle roofs and multiple gables
01 / Shingle

System 01 of 06

Architectural shingle

Full tear-off to the deck, new underlayment and laminated shingles — the system on most Northshore homes.

Profile
Laminated (dimensional) asphalt shingle
Best for
Pitched roofs, roughly 4/12 and steeper
Underlayment
Synthetic field; self-adhered membrane at valleys, eaves and penetrations
Ventilation
Balanced soffit intake + ridge exhaust
Typical time on site
1–3 days for most homes

Build-up, deck to topSection · n.t.s.

  1. Deck — plywood/OSB, bad sheets replaced
  2. Synthetic underlayment
  3. Drip edge + starter course
  4. Laminated shingles
  5. Ridge vent + cap

Every service, timeline and FAQ

A-02Sequence of work

How a job runs.

Four stages, the same on every roof. You always know which one you’re in and what you get at the end of it.

  1. Inspection

    We walk every roof plane we safely can, check the attic, measure, and photograph what we find.

    Time
    45–90 min, typical
    You get
    Photo report
    Cost
    Free
  2. Written estimate

    Line items, materials and options side by side — decking priced per sheet before work starts.

    Format
    Itemized PDF
    You get
    Options to compare
    Pressure
    None
  3. Install day

    Driveway protected, tear-off to the deck, bad sheets shown to you before they’re replaced, roof dried in the same day.

    Crew
    On site from 7 AM
    You get
    Daily photo update
    Shingles
    1–3 days
  4. Cleanup + walkthrough

    Magnet sweep of the yard and drive, debris hauled off, then we walk the finished roof with you, photos in hand.

    Sweep
    Magnetic, full lot
    You get
    Final photo record
    Sign-off
    With you
Exposed roof trusses and framing on a house under construction against a blue sky
Structure first — checked before anything goes on top

Atlantic hurricane season · June 1 – November 30

Storm rolled
through?

Start with safety and photos, not a ladder. We help you document roof damage for your insurer — we don’t promise how a claim turns out.

  1. 1
    Stay off the roof.Wet shingles and hidden damage don’t mix. Watch for downed lines.
  2. 2
    Photograph from the ground.Every side of the house, debris, and any stains inside.
  3. 3
    Stop water inside.Buckets, towels, move belongings. Call us for a tarp.
  4. 4
    Call your insurer.Get a claim number before anything beyond temporary repairs.
A-04Service areaSt. Tammany + nearby
Stylized map of the Northshore service areaLake PontchartrainMaurepasLake BorgneTangipahoa ParishSt. Tammany ParishMississippiCausewayNew Orleans ↓12105559NStylized — not to scale

Towns we serve

North of the lake from Slidell to Folsom, and west into Hammond and Ponchatoula. Check your zip code.

Next step

Get someone on the roof before you get a price.